[edit] Outline
Design build operate maintain (DBOM, also referred to as ‘turnkey’ procurement and ‘build-operate-transfer’) is a variation of the classic design and build method of procurement in which the main contractor is appointed to design and construct the works. This contrasts with the traditional procurement route, where the client first appoints consultants to design the development and then appoints a contractor to construct the works.
In DBOM, in addition to being responsible for the design and construction of the works to the employer’s requirements, the contractor is also responsible for operating and maintaining the completed facility. The operation and maintenance period can span as much as 20 to 30 years during which the contractor is said to have the ‘concession’ and is responsible for the safe and smooth operation of the facility, and may benefit from operational income. The facility itself however remains the property of the employer.
In the case of infrastructure that does not produce operational income, such as a non-toll motorway, the contractor is paid fees by the employer in the form of availability payments or shadow tolls (see below).
DBOM is commonly used for projects such as shopping and leisure centres, light rail, motorways, tunnels, bridges and other infrastructure. DBOM contracts are typically awarded through competitive bidding under a transparent tender process. Projects are procured from the private sector in a single contract while works are typically financed by the government (although employers can also be from the private sector). DBOM contracts are commonly a form of public private partnerships (PPP).
As work progresses, the employer pays the contractor for undertaking the works; maintenance is also paid for by the employer at an agreed price. At the end of the agreed maintenance and operation period, the contract may be renewed or the responsibility for operation and maintenance may revert to employer. Whether the contract is subject to renewal is usually stated at tender stage.
[edit] Pros and cons
Advantages include:
- A single source of responsibility for usually disparate functions of design, construction and maintenance.
- The DBOM contractor can establish a long-term maintenance programme up-front, plus estimated costs.
- Knowledge of methods and materials to be used allows the DBOM contractor to develop a tailored maintenance plan that anticipates and addresses potential issues thereby reducing risk and costs.
- It relieves the owner of the time and trouble spent on operational and maintenance issues.
Disadvantages of DBOM include:
- Long term needs must be specified up front to enable correct specifications to be drawn up.
- Owners lose much of the control they usually have with traditional contracts.
- Great care is needed to ensure correct standards are specified for design, construction and maintenance, especially if owners are not accustomed to the process
- Much risk is placed on the contractor but this is usually reflected in its price.
- Prices can turn out to be excessive in the long term (see PFI for more information)
[edit] Availability payments and shadow tolls
With availability payments, the employer must pay the contractor the same fees whether the facility is used or not. Such projects are therefore risky to embark upon but may nevertheless be in the employer's interest.
Shadow tolls are applied where, for whatever reason, there are no tolls exacted on the project in which case the employer pays the operator a per-vehicle amount as compensation for operating and maintaining the facility.
[edit] Related articles on Designing Buildings Wiki
- Availability payments.
- Build, own, operate and transfer (BOOT).
- Design and build.
- Design and build - pros and cons.
- Design, build, finance, maintain DBFM.
- Design Build Finance Operate Maintain DBFOM.
- Design build operate (DBO).
- Government Construction Strategy.
- Infrastructure UK.
- PF2.
- Procurement route.
- Private Finance Initiative.
- Public Private Partnership.
- Public procurement.
- Renovate, operate, transfer (ROT).
- Shadow tolls.
Featured articles and news
Wellbeing in Buildings TG 10/2025
BSRIA topic guide updates.
With brief background and WELL v2™.
From studies, to books to a new project, with founder Emma Walshaw.
Types of drawings for building design
Still one of the most popular articles the A-Z of drawings.
Who, or What Does the Building Safety Act Apply To?
From compliance to competence in brief.
The remarkable story of a Highland architect.
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.